Welcome to the
Brooklyn Centre WIKI

Cleveland, Ohio

A Neighborhood Exploration
Currently 301 articles regarding its history


St. Barbara Church Dedication Album

From Brooklyn Centre Wiki

(Difference between revisions)
Jump to: navigation, search
(Cornerstone)
Current revision (18:26, 3 April 2009) (edit) (undo)
 
(3 intermediate revisions not shown.)
Line 19: Line 19:
The church building on Denison Avenue was dedicated on July 25, 1952.
The church building on Denison Avenue was dedicated on July 25, 1952.
-
<gallery>
+
<gallery perrow="5">
Image:St_Barbara_Church_Dedication_(01).jpg|Archbishop Edward F. Hoban exiting the rectory on his way to the church dedication. Sylvia Juris is the young girl carrying the basket of flowers. The little girl between her and the Bishop may be Audrey Fitch.
Image:St_Barbara_Church_Dedication_(01).jpg|Archbishop Edward F. Hoban exiting the rectory on his way to the church dedication. Sylvia Juris is the young girl carrying the basket of flowers. The little girl between her and the Bishop may be Audrey Fitch.
Image:St_Barbara_Church_Dedication_(02).jpg|Archbishop Hoban proceeding from the rectory to the church. In the background is a view of East Denison Hardware.
Image:St_Barbara_Church_Dedication_(02).jpg|Archbishop Hoban proceeding from the rectory to the church. In the background is a view of East Denison Hardware.
Line 41: Line 41:
-
<div style="color:red;">NOTE: It is unclear what the 25th Anniversary was in celebration of. The church was founded in 1905, and the interior of the hall is clearly that of the newer church building which was constructed in 1951. This anniversary may have been celebrating Father Jarosz's 25 years as a priest, or 25 years as pastor. Perhaps someone more knowledgeable could tell us what the occasion was.</div>
+
Reverand Joseph Jarosz was appointed pastor in April of 1929. Celebration of his 25th anniversary of being pastor of St. Barbara's Church took place in 1954.
-
<gallery>
+
<gallery perrow="5">
Image:25th_Anniversary_(01).jpg|From left to right -- John Chmura, Frank Nowak, Tony Gut, Frank Schultz, Walter Wodzisz, Rev. Gackowski, Rev. Cymanski, Rev. Jarosz, Rev. Kuczmarski, Rev. Szczepanski, Ed Wartowski, Gawryszewski, Ray Roginski, Julius Teckman, Al Krupa.
Image:25th_Anniversary_(01).jpg|From left to right -- John Chmura, Frank Nowak, Tony Gut, Frank Schultz, Walter Wodzisz, Rev. Gackowski, Rev. Cymanski, Rev. Jarosz, Rev. Kuczmarski, Rev. Szczepanski, Ed Wartowski, Gawryszewski, Ray Roginski, Julius Teckman, Al Krupa.
Image:25th_Anniversary_(04).jpg|L to R -- Robert Slusar, Stanley Cielec, Bertha Zurowski, Rev. Kuczmarski, Rev. Cymanski, Rev. Jarosz
Image:25th_Anniversary_(04).jpg|L to R -- Robert Slusar, Stanley Cielec, Bertha Zurowski, Rev. Kuczmarski, Rev. Cymanski, Rev. Jarosz
Line 56: Line 56:
Image:25th_Anniversary_(12).jpg|Archbishop Edward F. Hoban
Image:25th_Anniversary_(12).jpg|Archbishop Edward F. Hoban
</gallery>
</gallery>
 +
=== 50th Anniversary ===
=== 50th Anniversary ===
Line 61: Line 62:
-
<gallery>
+
<gallery perrow="5">
Image:50th_Anniversary_(01).jpg
Image:50th_Anniversary_(01).jpg
Image:50th_Anniversary_(02).jpg
Image:50th_Anniversary_(02).jpg
Line 70: Line 71:
Image:50th_Anniversary_(07).jpg
Image:50th_Anniversary_(07).jpg
Image:50th_Anniversary_(08).jpg
Image:50th_Anniversary_(08).jpg
-
Image:50th_Anniversary_(09).jpg|Rev. Cymanski at left rear. Sharon Broda at right front.
+
Image:50th_Anniversary_(09).jpg|Rev. Cymanski at left rear. Linda Trujillo at front center. Sharon Broda at right front.
Image:50th_Anniversary_(10).jpg
Image:50th_Anniversary_(10).jpg
Image:50th_Anniversary_(11).jpg
Image:50th_Anniversary_(11).jpg
Line 86: Line 87:
Image:50th_Anniversary_(23).jpg
Image:50th_Anniversary_(23).jpg
</gallery>
</gallery>
 +
 +
 +
{{back2albums}}

Current revision

Contents

St. Barbara's Church on Denison Ave. in Cleveland, Ohio


Cornerstone

The cornerstone for the new church was laid May 27, 1951.

Church Dedication

The church building on Denison Avenue was dedicated on July 25, 1952.


25th Anniversary

Reverand Joseph Jarosz was appointed pastor in April of 1929. Celebration of his 25th anniversary of being pastor of St. Barbara's Church took place in 1954.



50th Anniversary



Return to Photo Albums or
Return to Main Page



Help support this website by visiting some of the Ads provided by Google.

Personal tools